For operational directors and site leaders in pharmaceutical manufacturing, an unscheduled line stoppage can represent a significant financial and operational disruption.

In high-speed secondary packaging, blister packaging or bottling facilities, unplanned downtime costs can accumulate rapidly, ranging from £6000 to more than £200,000 per hour.1
Preventive and predictive approaches can only go so far in terms of building mechanical resilience. Planned equipment servicing — as well as systems that signal deterioration early — can play a valuable role in terms of protecting production.
However, it can also cause sites to become exposed if recovery isn’t possible within a given timeframe.
A manufacturing continuity approach can complement these methods by building recovery capability upfront, before equipment fails, so teams have a controlled route to restoring production when disruption occurs.
Tom Fripp, founder and Director at Addparts, reports.