Preventing unplanned downtime in chemical manufacturing

Published: 19-Sep-2025

The role of load bank testing in ensuring reliable backup power systems

You need to be a subscriber to read this article.
Click here to find out more.

According to 2022 data from Siemens, an average large plant loses 25 months to unplanned downtime.

In chemical manufacturing, when production is highly process-driven and continuous by nature, downtime is more than an inconvenience; it’s a costly disruption that impacts productivity and profitability.

Here, Andrew Keith, Division Director at load bank manufacturer Power Prove, explores the role of load bank testing in backup power systems to prevent unplanned downtime. 

Not yet a Subscriber?

This is a small extract of the full article which is available ONLY to premium content subscribers. Click below to get premium content on Manufacturing Chemist.

Subscribe now Already a subscriber? Sign in here.

You may also like